What a septic permit establishes
A septic permit establishes that the local health department gave permission to build an on-site sewage system of a stated design at a stated spot on the lot. The as-built drawing that follows records where the installer says the tank and drain field actually went. Together they document permission and placement on paper; neither measures how the system performs now.
That is the reason for the distinction. The permit file shows that the required steps were taken at the time: a site was evaluated, a design was approved, and in most cases someone from the health department looked at the work before it was buried. It does not show what has happened underground in the years since, and on an older northern Michigan house that can be decades.
In Wexford County the permit comes from District Health Department #10 (DHD #10), which issues permits for private wells and septic systems across ten counties. Michigan has no statewide sanitary code, so the rules that govern a permit are the health department's own.
How a septic permit file is built
A complete DHD #10 file is assembled in stages, and each stage leaves its own paper:
- Application and site plan. The owner applies with a drawing of existing and proposed buildings, wells, sewage systems and driveways, with distances to property lines, lakes and streams, and with any well or septic system within 50 feet of the property line marked.
- Soil evaluation. A sanitarian (a health department environmental health specialist) investigates the site to judge whether the soil can accept effluent, sometimes from backhoe pits.
- Design and permit. DHD #10 designs the system and issues the permit, which sets the size, type and location of the tank and drain field.
- Final inspection. Before the system is covered, the owner or contractor must contact the sanitarian for a final inspection.
- As-built plan. The installer submits a drawing of the system as installed.
Under the district sanitary code, a sewage disposal permit expires two years from the date it is issued and may be extended once, for one year, if the extension is requested in writing before it expires. That two-year term is a health department rule. It is separate from the 180-day expiration that applies to building permits under the Michigan Residential Code.
The as-built drawing and the contractor affidavit
The as-built drawing (a sketch or plan of the system as actually installed, as opposed to as designed) is often the most useful page in the file. It is the document a later owner turns to when trying to find the tank lid or keep a new garage off the drain field. The DHD #10 sanitary code requires the installer to submit a final as-built plan.
Its authority comes from the installer, not from a land survey. Its measurements are only as useful as the reference points it was drawn from, so if the house has since been added to, or a reference point has changed, the drawing can be accurate and still hard to apply.
The file may also hold a contractor affidavit in place of a sanitarian's final inspection. DHD #10 states that the owner or contractor must contact the sanitarian 24 hours before covering a system, and that if the sanitarian cannot come within that time, the sanitarian may allow the owner or contractor to complete a contractor affidavit and cover the system. The code likewise allows a final inspection to be waived when the permit holder provides proper verification, with the installer signing a statement that the system was built as permitted.
The difference matters to anyone reading the file. A final inspection is a health department observation. An affidavit is the installer's sworn word. Both are legitimate parts of the record; only one involves the department's own eyes on the open trench.
What a septic permit does not establish
The permit file is a history of permission. Holding one, a reader cannot conclude any of the following:
- Present function. A system approved in 1994 may since have been overloaded, damaged by vehicles or roots, or affected by a high water table. The file records the system when new.
- Maintenance. DHD #10 recommends pumping the tank every three to four years, but a permit is not a pumping record. Pumping receipts are a separate private record.
- That the system matches the design. Where the final inspection was replaced by an affidavit, the file shows the installer's account rather than the department's observation.
- That the system in use is the permitted one. Repairs, replacements and unpermitted work leave a property with more history than one permit shows.
- Compliance with any statewide standard. There is none to comply with.
A missing permit establishes little on its own. An older cottage may simply predate the current filing practice.
Where it is commonly misread
The most common misreading equates an approved permit with an approved system today. Approval is a fact about the date of installation. It is not a later finding, and it is not a time-of-sale evaluation.
A second misreading treats the size on the permit as the size the house can now support. The permit reflects the design approved for the house as it was described in the application. A bedroom addition or a converted garage is a later change the original permit does not account for.
A third involves expiration. A permit that expired before the system was built is a permit for a system that may never have been installed under it. A permit that was used and finalized remains the history of what was approved. Reading the dates on the permit, the final inspection and the as-built drawing together shows which of those happened.
A fourth assumes a licensed contractor did the work. DHD #10 allows homeowners to install their own septic systems; all others must be licensed by the department. A homeowner-installed system is still inspected and recorded the same way, but the name on the file may be the owner's.
The scale is worth remembering. EGLE has written that Michigan has more than 1.3 million septic systems and that, by some estimates, more than 20 percent are failing. Most of those systems have a permit in a file somewhere.
Where the permit sits among the water records
The septic permit is one of three records that usually sit together in a DHD #10 property file, alongside the well permit and any time-of-sale or mortgage evaluation. The permit and as-built record what was approved and installed. An evaluation, where one exists, records what an evaluator later observed. The DHD #10 residential well and septic page describes the permit and final inspection process as the department publishes it.
The rules themselves are in the DHD #10 sanitary code, approved in 2007 and revised January 25, 2019. A statewide code remains a proposal: Senate Bill 771 of 2026 was on third reading in the Senate as of its last recorded action on June 17, 2026, and its status should be checked before relying on it.
This site designs nothing, inspects nothing, pulls no records and refers nobody. It describes what the permit file establishes.