Three kinds of authority over one lot
A lot near Cadillac collects records from three separate sources of authority, and almost every misreading of those records starts with treating them as one file. The first is the construction code, which governs what is built on the land. The second is state environmental law, which governs what is done to water, shoreline, wetland and soil. The third is property law, which governs who holds what right in the land and the water beside it, and which lives in deeds, plats and recorded easements rather than in any permit.
Each source produces its own paperwork, kept by a different office, for a different reason. A building permit sits with a local enforcing agency (the county, city or township office that administers the state construction code for that place). A shoreline or wetland permit sits with the Michigan Department of Environment, Great Lakes, and Energy, usually shortened to EGLE. A lake-access easement sits with the county register of deeds, because it is a property interest, not a permission. None of these offices is obliged to know what the others hold, so a clean answer from the building department says nothing about the dock.
Who produces each record
The construction records come from whichever body enforces the code in that place. In Wexford County that is usually the county itself: the Wexford County Building Department issues building, plumbing, mechanical and electrical permits for every part of the county except Cedar Creek Township and the City of Manton, which issue their own building permits, and the City of Cadillac, which issues its own building, trade and soil erosion permits. Cadillac has retained a private contractor, Associated Government Services, to run permitting and inspections on the city's behalf. The certificate of occupancy (the enforcing agency's statement that a new building may be used) comes from the same office that issued the permits, once each permit has received its final inspection.
The water and soil records come from two levels at once. EGLE administers Part 301 of the Natural Resources and Environmental Protection Act, which covers inland lakes and streams, and Part 303, which covers regulated wetlands. Part 91 governs soil erosion and sedimentation control (SESC), but locally it is administered by a county or city agency: Wexford County issues SESC permits everywhere in the county except the City of Cadillac, which issues its own. EGLE describes the usual trigger as any earth change within 500 feet of a lake or stream, or more than one acre of disturbance anywhere, and notes that triggers may vary.
The property records come from the people who own and convey the land. A deed, a plat (the recorded map that divides a subdivision into lots and shows any shared access strips) and an easement are written by owners and their lawyers and recorded by the register of deeds. Recording makes an instrument public; it does not settle what the instrument means.
Who relies on each record
The people who rely on these records are not the people who produced them. A lender wants to know that a house was lawfully built and may be occupied, so it asks about permits and the certificate of occupancy. A title insurer cares about the chain of deeds and recorded easements. A buyer of a lake lot wants to know whether the dock can stay, whether the neighbors behind can launch boats from the shared strip, and whether the low corner of the yard can be filled.
Those three questions land on three different records. Whether the dock may stay is a Part 301 question. Whether the back-lot owners may use the strip is an easement question. Whether the low corner may be filled may be a Part 303 question and a Part 91 question at once. A record answers the question its producer was asked, and the reader's job is to match the question to the right paper.
Manufactured homes add one more crossing. Under MCL 125.2330i, a mobile home set on a foundation on land the owner holds outright, or under a ground lease of at least 20 years, can be converted from titled personal property into real property by an affidavit of affixture: the state cancels the certificate of title and the owner records the affidavit with the register of deeds. Until that happens, the home and the land travel on separate paper. The question matters locally: the American Community Survey 2020-2024 estimates put mobile homes at 13.6 percent of Wexford County housing units against 5.0 percent statewide.
The structural reason these records are misread
These records are misread for a structural reason, not a careless one: most of them record permission, and permission is easy to mistake for a finding. A building permit records that someone was authorized to build. It becomes evidence about the finished work only when the inspections it required were performed and signed off, and the permit itself is the same document whether they were or not. Under the 2015 Michigan Residential Code, section R105.5, a permit becomes invalid if work does not start within 180 days or stops for 180 days; Wexford County's own information packet adds that a permit will be cancelled if no inspections are requested or performed within six months of issue. A permit card on file can therefore describe a project that never reached final inspection.
The second structural reason is that exemption leaves no trace. EGLE's Part 301 overview explains that a seasonal, private, non-commercial dock or boat hoist that does not unreasonably interfere with others needs no permit, while a permanent dock or hoist left in year-round does. A lake lot with no Part 301 file may be fully lawful or may hold an unpermitted structure, and the absence of a record cannot say which. The same holds for wetlands: Part 303 reaches only regulated wetlands, so the lack of a wetland permit is not a statement that no wetland exists.
The third reason is that property rights and regulatory permission run on different tracks. A riparian owner's right to build a dock comes from owning land that touches the water; a permit decides only whether a particular structure on the bottomland is allowed. An EGLE approval does not create a riparian right, and a recorded easement does not create a permit.
Lakes, shoreline and the ground near water
Water makes this family heavier than it would be in most of the state. EGLE counts 11,000 inland lakes in Michigan, and Lake Cadillac alone, according to the City of Cadillac, covers 1,150 acres with 7.8 miles of shoreline, joined to Lake Mitchell by a canal dug in the 1870s to float logs to the mills. Every foot of that shoreline sits inside the 500-foot band where an earth change usually needs an SESC permit, and much of it sits within 500 feet of an inland lake, where wetlands are regulated under Part 303.
Part 301 itself turns on two definitions in MCL 324.30101. An inland lake excludes the Great Lakes, Lake St. Clair and any lake or pond smaller than 5 acres. Bottomland is the land below the ordinary high-water mark. A structure placed on bottomland, dredging or filling it, a marina, or a canal within 500 feet of the ordinary high-water mark requires a permit. EGLE adds that sand placed waterward of the water line needs a permit.
Who may use the water is a separate matter, decided by case law. The Michigan Supreme Court's 1986 decision in Thies v Howland, quoted in the Court of Appeals' 2022 opinion in Astemborski v Manetta, describes riparian land as land that includes or is bounded by a natural watercourse and sets out the different rights of riparian and nonriparian users. This site describes that case law; it does not apply it to any particular lot.
What this family of records cannot tell anyone
No record in this family is a survey, an inspection of current condition or a legal opinion. A final inspection shows that a building official observed the work at that stage under the code then in effect; it says nothing about later alterations. Wexford County enforces the 2015 Michigan Residential Code, and the 2021 edition's start was put on hold by the Court of Claims in July 2025; as of November 2026 the state's code page still lists the 2015 edition as current, and that status should be checked again before anyone relies on it.
An EGLE permit approves a described project; it does not certify that the structure built matches the drawing. A recorded easement grants what its words grant, and Michigan courts have held that an easement holder's use is limited to the purposes for which the easement was granted, which is why the exact language of the instrument carries so much weight. None of these records measures the lot line, the water's edge or the high-water mark on the ground.
Read together, these records show a lot as a set of separate permissions and rights, each with its own keeper, rather than as one file with one answer.