The short answer: the county, with three exceptions
For most of Wexford County, building permits are issued by the Wexford County Building Department in Cadillac, which also issues the plumbing, mechanical and electrical permits. The exceptions are the City of Cadillac, the City of Manton and Cedar Creek Township, each of which issues its own building permits, so a permit record for a house in one of those three places sits in a different file.
That division matters more to a reader holding a record than to a builder applying for one. A builder simply goes where the forms are. A buyer, lender or heir trying to learn whether work on a house was permitted has to know which office would have issued the permit, because no office holds the others' files. Asking the county about a house inside Cadillac city limits produces no record, and that silence says nothing about whether a permit exists.
Why Michigan permits come from different offices
Michigan writes one construction code for the whole state under the Stille-DeRossett-Hale Single State Construction Code Act, 1972 PA 230, but it does not enforce that code from one office. Enforcement is local: the enforcing agency (the body that reviews plans, issues permits and performs inspections) can be a city, a township or a county, and it differs from one unit of government to the next.
The result is a patchwork that differs from county to county. In Wexford, the county carries most of the load. In neighboring Missaukee and Lake counties, the state's statewide jurisdiction list, revised October 9, 2023, shows the county as the enforcing agency for building, electrical, mechanical and plumbing work in every unit, including Lake City and McBain in Missaukee and Baldwin and Luther in Lake. The same list could not be read for Wexford, so the county's own page is the best published guide here, and a reader should confirm jurisdiction with the county before relying on it.
For contrast, many larger cities run every permit through one municipal department, and their records read as a single file. Seeing how permit records read in a Texas city makes the point: a municipal system and a county-plus-exceptions system put the same kind of paper in very different places.
The City of Cadillac and its contractor
Cadillac is the largest exception and the one most often mistaken. According to the City of Cadillac's permit page, as published in 2025, the city has retained Associated Government Services (AGS), a private firm, to provide its building permit and inspection services. Applications are filed at City offices at 200 N. Lake Street, where the Community Development Department handles intake and payments, and only trade permits (electrical, mechanical and plumbing) are accepted through the city's online portal.
The private contractor does not change whose record it is. AGS acts for the city as the enforcing agency, so a Cadillac permit is a City of Cadillac record even when a contractor's inspector signed it. Contract arrangements can change, which is one reason to date any statement about who performs the work.
Cadillac also issues its own soil erosion and sedimentation control (SESC) permits, the permits required for earth changes near water or over one acre. Elsewhere in the county those come from the county. The city keeps one more record that has no county equivalent: residential rentals, including mobile homes, rented for more than three months in a calendar year must be registered with the city.
What the county issues, and under which code
The Wexford County Building Department, at 401 North Lake St. in Cadillac, issues building, plumbing, mechanical and electrical permits for the townships and villages outside the three exceptions, and administers SESC permits for every part of the county except the City of Cadillac. Its page, which notes a fee increase as of May 21, 2025, states that it enforces the 2015 Michigan Residential Code for houses, the 2021 Michigan Building Code for commercial work and the 2023 National Electrical Code, which took effect March 12, 2024. The 2021 residential code's start was put on hold by the Court of Claims in July 2025; that status should be checked before relying on it.
The county's building information packet adds local design criteria that show up in plan review: trusses and rafters designed for a 60 pound-per-square-foot ground snow load, footings at least 42 inches below final grade, and sealed drawings for single-family houses of 3,500 square feet or more. These are county requirements, not a statewide table. The packet also says accessory structures under 200 square feet and under 10 feet high need no building permit, though zoning approval is still required, which means a small shed can be lawful and leave no building permit behind.
What a permit record does not establish
A permit records permission to do work, not a finding that the work was done well or at all. Under the 2015 Michigan Residential Code, section R105.5, a permit becomes invalid if work does not begin within 180 days or is suspended for 180 days; that rule is in the code, not in the 1972 statute. The Wexford County packet adds that a permit will be cancelled if no inspections are requested or performed within six months of issue. Missaukee County, by contrast, adopted a local policy that new permits issued from January 1, 2025 are valid for one year, with one extension.
The record that speaks to completed work is the final inspection and, for a new building, the certificate of occupancy, which state law under MCL 125.1513 requires before a new building is used. Statute also exempts ordinary repairs and buildings incidental to agricultural use from the permit requirement, so an absent permit is not by itself evidence of unpermitted work. This guide describes the system; it does not say whether any particular house was properly permitted.
Where readers go wrong
The most common error is asking the wrong office. A permit history requested from the county for a Cadillac, Manton or Cedar Creek Township address will come back empty, and an empty answer is easy to misread as proof that no permit was pulled. The second error is treating an issued permit as a finished one. The third is assuming that a shoreline project needs only a building permit, when SESC rules reach most earth changes within 500 feet of a lake, stream or county drain and work on lake bottomland falls to the state. Each of these errors comes from the same root: the record is real, but it sits in a narrower file than the reader assumed.