What a certificate of occupancy establishes
A certificate of occupancy establishes that the enforcing agency (the building department, or the contractor acting for it, that administers the state construction code at that address) completed its review of permitted work, gave it final approval and allowed the building to be used. It is a public body's formal determination about a building on a stated date, signed off by the office that inspected the work.
Under 1972 PA 230 a newly constructed building may not be used or occupied, in whole or in part, until a certificate of use and occupancy is issued by the appropriate enforcing agency. For an existing building that remained in use while it was being altered, the statute allows continued use for 30 days after the work is completed. The certificate is therefore the closing entry in a construction file: the record that the permits opened for the work have reached final approval.
The verified condition is narrow in time and scope. It covers the work that was permitted, as it stood when the final inspections were made, measured against the code edition that applied to those permits.
How it is issued around Cadillac
The certificate comes from the same office that issued the permits. In Wexford County that is the county building department for most of the county. The City of Cadillac issues its own permits and carries out inspections through a private contractor it has retained, and Cedar Creek Township and the City of Manton issue their own building permits. A certificate for a house inside the Cadillac city limits is therefore a city record, not a county one.
Wexford County's Building Information Packet, published in 2024, describes the county's practice: a certificate of occupancy is issued once all construction permits for the project receive final approval. Building, electrical, plumbing and mechanical work each carry a separate permit, so a certificate in this practice implies that every one of those permits reached final approval, not just the building permit.
The county also issues a temporary certificate of occupancy on written request. As published in the packet, it carried a $100 fee and expires three months after issuance. A temporary certificate allows occupancy while items remain open; it is not the final determination.
The code the approval was measured against
A certificate shows conformity with the code in force for the permits it closes. For a house permitted in Michigan since February 8, 2016, that is the 2015 Michigan Residential Code, which LARA's Bureau of Construction Codes still listed as current in November 2026. The 2021 residential code was scheduled to take effect August 29, 2025, but the Michigan Court of Claims stayed it on July 7, 2025 while litigation was pending; its status should be checked before relying on this point.
A certificate issued decades ago was measured against whatever code that enforcing agency applied at the time. It does not show conformity with the current code.
Wexford County also applies its own design criteria, including a 60 pounds-per-square-foot ground snow load for trusses and rafters and footings at least 42 inches below final grade. Those are the county's own requirements, not a statewide table.
What a certificate of occupancy does not establish
The certificate is a verified finding about a past moment and a defined set of permits. Its limits follow from that.
- The house today. It says nothing about wear, damage, moisture or maintenance in the years since issue.
- Later work. Additions, basement finishes, decks or system replacements done afterward are outside it, whether or not they were permitted.
- Unpermitted work. Anything built without a permit was never part of the review the certificate closes.
- The well and the septic system. These are permitted by the health department, District Health Department #10 in Wexford County, not by the building department. Wexford County has no mandatory time-of-sale well or septic evaluation.
- Land and water permits. Soil erosion, shoreline and wetland work carry separate permits from other agencies.
- Ownership, boundaries or zoning history. The certificate concerns construction, not title or survey.
Where certificates of occupancy are commonly misread
The most frequent misreading treats a certificate as a statement that the house meets code now. It records that the permitted work was approved when it was finished. A certificate from 2005 says nothing about a deck rebuilt in 2020.
A second is treating a temporary certificate as final. In Wexford County a temporary certificate lapses three months after issue; a file that holds only a temporary certificate may mean final approval was never recorded. What that means for a specific house is a question for the issuing office.
A third is reading the absence of a certificate as proof that a house is illegal to occupy. Many older houses have no certificate that a reader can locate, records may be incomplete, and some structures, such as small accessory buildings under 200 square feet and under 10 feet high in Wexford County, need no building permit at all. A missing certificate is a question to put to the enforcing agency, not a finding.
A fourth is assuming that because a certificate exists, every permit on the property is closed. A certificate closes the permits for the project it covers. Permits opened later for other work, and left without final inspection, can still appear as open in the file.
Reading the certificate against the rest of the file
The certificate is most informative when it is read with the permits it closes. The permit file shows what work was described, which code edition applied and which inspections were made; the certificate confirms they reached final approval. Under section R105.5 of the 2015 residential code, a permit becomes invalid if work does not start within 180 days or is suspended for 180 days, and Wexford County cancels a permit if no inspections are requested or performed within six months of issue. Those rules explain why a file may show expired permits alongside a certificate for a different project.
The statutory text is in MCL 125.1513 on the Michigan Legislature's site. Wexford County's practice on final approval and temporary certificates is set out in its Building Information Packet; because fees and procedures change, the current version is the one to check.