What the permit records
A wetland permit shows that the state approved one described activity, such as placing fill or building in a wetland that Michigan regulates, for the applicant named and under the conditions attached. It does not show how the work was actually carried out, where wetland lies on the rest of the parcel today, or that the lot has no other regulated wetland.
The permit comes from Part 303 of the Natural Resources and Environmental Protection Act (NREPA, 1994 PA 451, the state's omnibus environmental statute), administered by the Michigan Department of Environment, Great Lakes, and Energy (EGLE). Part 303 applies only to a regulated wetland: a wetland that meets one of the location, connection or size tests the law sets out.
The document in a reader's hands is therefore an approval. It describes a proposed project, the drawings and site information submitted with it, and EGLE's conditions. It is a record of what the state allowed, not an observation of what the ground holds.
Which wetlands and which activities
EGLE lists the wetlands Part 303 regulates. A wetland is regulated if it is any of the following:
- connected to an inland lake, pond, river or stream;
- within 500 feet of an inland lake, pond, river or stream;
- within 1,000 feet of a Great Lake or Lake St. Clair;
- more than 5 acres, if not connected to such waters;
- smaller than that, where EGLE determines the wetland is essential and notifies the owner.
Within a regulated wetland, a permit is required to deposit fill, to dredge or remove soil or minerals, to construct, operate or maintain any use or development, or to drain surface water.
The 500-foot distance matters around Cadillac. Lots near Lake Cadillac, Lake Mitchell and the other lakes and streams of Wexford County sit within that distance by their location, so a low or wet area on such a lot falls under the first two tests rather than the size test.
The state and federal layers
Wetland fill is regulated federally as well as by the state, under Section 404 of the Clean Water Act (the federal provision governing the discharge of dredged or fill material into regulated waters). According to EGLE, Michigan received federal authorization in 1984 to administer Section 404 itself. Applicants in Michigan generally submit one wetland permit application to EGLE, and the U.S. Environmental Protection Agency reviews about 1 percent of the applications received.
The same joint permit application is used for projects that also touch an inland lake or stream under Part 301, but those projects receive separate review processes. A file can therefore hold a single application that produced approvals under more than one part of the statute, each with its own terms.
On volume, an EGLE presentation from February 2020 reported that its resource permitting program received about 5,000 applications a year, with an average of 18 days to confirm an application complete and 41 days of overall processing. Those figures cover the whole program, not wetland permits alone.
What the permit does not establish
- Completion or compliance. The permit approves a plan. It does not record that the fill, structure or drainage matched the plan, or that the conditions attached to it were met.
- The rest of the lot. An approval covers the area and activity it describes. It does not certify that other parts of the parcel lie outside regulated wetland.
- Present boundaries. Any wetland line drawn for the application reflects the site when the application was prepared.
- Other permits. Earth changes near water usually also need a soil erosion and sedimentation control (SESC) permit under Part 91; in Wexford County the county issues it outside the City of Cadillac, and the city issues its own. A house built in or beside the approved area also needs its own building permit.
- Anything about the house itself. The permit concerns land and water, not the structure, its foundation or its drainage.
Where the permit is commonly misread
The most common misreading is the absent permit. A lot with no wetland permit on file is read as a lot with no wetland. The absence establishes only that no approval is in the file being examined; it does not establish whether a regulated wetland exists, whether earlier work needed a permit, or whether one was sought. On a low lot near water it is a question, not an answer.
The second misreading treats the permit as covering the whole parcel. It covers a described activity in a described area. A later owner who wants to extend a driveway, add fill for a garage or regrade a yard is outside that description.
The third treats appearance as the test. Regulation under Part 303 turns on the criteria EGLE lists, which concern connection, distance from water and size. How a lot looks on the day of a showing, after a dry month or under snow, is not one of them.
A fourth confuses a wetland permit with an EGLE determination about a small, isolated wetland. When EGLE finds such a wetland essential and notifies the owner, that notice is its own record, distinct from a permit to work in the wetland.
Reading it with the rest of the file
A wetland permit is most informative alongside the records that describe the same ground from other angles: the site drawings submitted with it, any Part 301 approval issued from the same joint application, the SESC permit for the upland earth work, and the building permit for any structure that followed. Comparing the approved footprint with what the lot shows today is the step the permit itself cannot perform.
The EGLE state and federal wetland regulations page sets out the regulated categories and the activities that need a permit. EGLE's EGLE soil erosion guidance describes the separate 500-foot trigger for erosion control, which overlaps geographically with the wetland distance test but is a different program with a different permit.